One problem, one method, one result.

Three jobs described properly, rather than a list of everything we have ever touched. Client and site identities are withheld; full references are available on request, subject to their consent.

Root cause analysis of repeated PT and RMU failures

33kV
Client

International engineering firm

End user

Distribution utility, Middle East

Scope

System study & RCA

Discipline

Power system studies

Situation

Potential transformers and ring main units on a 33 kV network were failing repeatedly. Replacement had not stopped recurrence, which meant the cause lay in the system rather than in the individual units.

SLPL was engaged through the project consultancy to establish why.

What we did

Describe the investigation: what was measured or modelled, what network data was pulled, which failure modes were tested and eliminated.

Result

State the root cause found and the corrective recommendation, then the outcome — whether failures stopped after implementation.

Failures before
Failures after
Time to diagnosis

GIS testing and commissioning on a 765 kV transmission build-out

765kV
Client

EPC contractor

End user

Central transmission PSU

Scope

Testing & commissioning

Period

2025–26, 2026–27

Situation

The substation forms part of the transmission build-out for the largest renewable energy park in India. At 765 kV, gas insulated switchgear leaves no margin for a test regime that is anything less than complete.

SLPL was appointed for testing and commissioning of the GIS.

What we did

Describe the scope in numbers: how many bays, which equipment, which tests, over what duration, with how many engineers deployed.

Result

State the outcome — charging achieved on schedule, defects caught before energisation, or whatever the job file actually supports.

Bays commissioned
Engineers deployed
Schedule variance

O&M of a 300 MW solar pooling substation

220kV
Client

Renewable energy developer

Region

Northwestern India

Scope

Operation & maintenance

Discipline

O&M

Situation

A 220 kV pooling substation evacuating 300 MW of solar generation. Every hour the substation is unavailable is generation that cannot reach the grid, so availability is the metric the contract turns on.

SLPL took over operation and maintenance of the station.

What we did

Describe the O&M regime: manpower deployed, shift pattern, preventive schedule, diagnostics used, escalation and response arrangements.

Result

State availability achieved, breakdowns attended and mean restoration time — figures the client can confirm.

Availability
Breakdowns attended
Mean restoration