Home/Case studies

One problem, one method, one result.

Three jobs described properly, rather than a list of everything we have ever touched. Client and site identities are withheld; full references are available on request, subject to their consent.

Root cause analysis of repeated PT and RMU failures

33kV
Client

International engineering firm

End user

Distribution utility, Middle East

Scope

System study & RCA

Discipline

Power system studies

Situation

Potential transformers and ring main units on a 33 kV network were failing repeatedly. Replacement had not stopped recurrence, which meant the cause lay in the system rather than in the individual units.

SLPL was engaged through the project consultancy to establish why.

What we did

Performed a 33 kV system study and RCA covering fault levels, switching transients, earthing, PT loading and ferroresonance risk. Reviewed protection settings, disturbance records and failure patterns to identify the common system-level cause.

Result

Root cause was identified as transient overvoltage/ferroresonance conditions affecting the PT–RMU combination. Recommended revised PT protection, damping/earthing measures and switching/protection coordination, eliminating the recurring failure mechanism.

RepeatedFailures before
0Failures after
2weeksTime to diagnosis

GIS testing and commissioning on a 765 kV transmission build-out

765kV
Client

EPC contractor

End user

Central transmission PSU

Scope

Testing & commissioning

Period

2025–26, 2026–27

Situation

The substation forms part of the transmission build-out for the largest renewable energy park in India. At 765 kV, gas insulated switchgear leaves no margin for a test regime that is anything less than complete.

SLPL was appointed for testing and commissioning of the GIS.

What we did

Executed comprehensive testing and commissioning of 4 GIS bays, covering primary equipment, protection, control, interlocking, and associated systems. 7 engineers were deployed for coordinated field testing, verification, and commissioning.

Result

All 4 GIS bays were successfully tested and commissioned with zero schedule variance, supporting timely energisation and project execution.

4Bays commissioned
7Engineers deployed
0daysSchedule variance

O&M of a 300 MW solar pooling substation

220kV
Client

Renewable energy developer

Region

Northwestern India

Scope

Operation & maintenance

Discipline

O&M

Situation

A 220 kV pooling substation evacuating 300 MW of solar generation. Every hour the substation is unavailable is generation that cannot reach the grid, so availability is the metric the contract turns on.

SLPL took over operation and maintenance of the station.

What we did

Managed end-to-end O&M of the 220 kV, 300 MW solar pooling substation, with preventive maintenance, condition monitoring, fault diagnostics, breakdown response, and 24×7 operational support.

Result

Maintained 99.9% availability while attending 13 breakdown events, with rapid fault isolation and restoration to minimise generation losses.

99.9%Availability
13Breakdowns attended
2.5hoursMean restoration

Tell us what needs testing, running or solving.

Send us the voltage class, location and equipment schedule. We'll come back with a view on approach, mobilisation and commercials.